Havila Harmony to DSV – Dive Support Vessel
Following wet storage of the flexible lay spread on the sea bed, the Havila Harmony (HH) was demobilised from an Installation Vessel (ISV) and re-mobilised as a Dive Support Vessel (DSV) for the second phase of the Puffin Field Subsea Installation. Orwell Offshore personnel provided engineering, design and technical input to planning.
This included the following:
- Function test and classification of dive equipment
- Load and seafasten dive spread onto mezzanine deck main components (including twin lock chamber
- frame, spool piece, single lock chamber frame, bell LARS and HRC LARS)
- Pressure test of dive spread
- Fabrication and installation of mezzanine deck extension pieces to accommodate the dive spread equipment
The actual mobilisation was carried out in Singapore’s Loyang Offshore Supply Base over a 15 day period.